Customization: | Available |
---|---|
Certification: | ISO9001, CE |
Shell Material: | Stainless Steel |
Still deciding? Get samples of US$ 1000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Solid insulation switchgear as a new environmentally friendly ring main unit is designed and developed by us. It is modular designed, including load break switch module, vacuum circuit breaker module, busbar connection module, PT module, busbar sectionalizer module and metering module. These modules can be extended or combined flexibly.
Compared with traditional SF6 gas insulated switchgears, solid insulation RMU has better performances, higher reliability and wider application range, and it is an ideal replacement of SF6 switchgears. It adopts solid insulating materials as main insulation medium, main circuits (including electric connection, disconnector, vacuum interrupter, busbar) are sealed to be form a fully insulated and sealed structure.
TSIS solid insulation switchgear modules:
C-- load break switch module
V-vacuum circuit breaker module
D-cable connection module
PT-power transformer module
Sv-busbar sectionalizer module
ME-metering module
Applications
No. | Items | 24 load break switch |
24 vacuum circuit breaker |
24 disconnec-tor |
|
1 | Rated voltage | kV | 24 | ||
2 | Rated current | A | 630/ 1250 |
630/ 1250 |
630/ 1250 |
3 | Rated frequency | Hz | 50/60 | ||
4 | Rated short circuit making current | kA | 50 | 50 | / |
5 | Rated short circuit breaking current | kA | 20/25 | 20/25 | / |
6 | Rated short time withstand current | kA | 20 | 20 | |
7 | Rated peak withstand current | kA | 50 | 50 | |
8 | Operating sequence | o-0.3s-co- 180s-co |
o-0.3s-co- 180s-co |
Combining manufacturing experience, new technology, industrial knowledge and more than ten years exporting experience, TENLEE aims to build advanced power distribution and protection systems.
TENLEE is specialized in manufacturing a comprehensive range of solutions from 12kv to 40.5kv for indoor/outdoor systems: gas insulated switchgears
ring main unit
sf6 free switchgears
vacuum circuit breakers
sf6 circuit breakers
reclosers
load break switches
disconnectors
distribution transformers/power transformers
substations
standard switchgear packaging: wooden
delivery time: within 30 days
shipping:
-- sea
-- air
-- railway
1.What is the payment terms?
TT, paypal, western union, etc.
2. What is the guarantee period?
Usually the guarantee period is 18 months after delivery.
3. Do you have type test?
Yes, we pass type test in Europe.