Customization: | Available |
---|---|
Certification: | ISO9001, CE |
Shell Material: | Stainless Steel |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
General Description
TRM-A air environmentally firendly ring main unit is flexible and modular designed. Several modules are available: circuit breaker module, PT module, busbar connection module, sectionalizer module, metering module, etc, satisfying different application plans. Several modules in one common tank or single module are available. Modules can be combined and extended flexibly.
It is maintenance free. All the live parts in the primary circuit and switch functions are sealed in the metal gas tank, preventing environmental influence and increasing reliability.
Standard
- IEC62271-100 AC circuit breaker
- IEC62271-102 AC high voltage disconnector and earthing switch
- IEC 62271-200 AC metal closed switchgear and control equipment
- IEC 60265 high voltage load break switch
Parameters
C module | F module | Vc module (spring mechanism) |
Vc module ( magnetic actuator) |
|||
Switch disconnector | Switch-fuse disconnector | VCB | Earthing switch/ disconnector |
VCB | Earthing switch/ disconnector |
|
Rated voltage Kv | 12/24 | 12/24 | 12/24 | 12/24 | 12/24 | 12/24 |
Power frequency withstand voltage Kv | 42/50 | 42/50 | 42/50 | 42/50 | 42/50 | 42/50 |
Lightning impulse withstand voltage Kv | 92/125 | 92/125 | 75/125 | 75/125 | 75/125 | 75/125 |
Making capacity kA | 50/40 | Limited by high-voltage fuse | 50/40 | 50/40 | 50/40 | 50/40 |
Combining manufacturing experience, new technology, industrial knowledge and more than ten years exporting experience, TENLEE aims to build advanced power distribution and protection systems.
TENLEE is specialized in manufacturing a comprehensive range of solutions from 12kv to 40.5kv for indoor/outdoor systems: gas insulated switchgears
ring main unit
sf6 free switchgears
vacuum circuit breakers
sf6 circuit breakers
reclosers
load break switches
disconnectors
distribution transformers/power transformers
substations
Standard packaging: wooden
delivery time: within 30 days
1.What is the payment terms?
TT, paypal, western union, etc.
2. What is the guarantee period?
Usually the guarantee period is 18 months after delivery.
3. Do you have type test?
Yes, we pass type test in Europe.