1.Structure features
YB series prefabricated substation is composed of high voltage power distribution equipment, transformer and low voltage power distribution equipment, divided into three functional compartments, which are high voltage room, transformer room and low voltage room.
2. Enclosure types
General substation which is made of ordinary steel plate
High anti-corrosion type substation which is made of stainless steel or aluminum alloy plate
Heat preservation and insulation type substation which is made of colored composite plate
Other kinds of substations
3. typical looks of prefabricated substations
Prefabricated substation parameters
No | Item | Unit | High voltage | Low voltage | |
1 | Rated voltage | Kv | 24 | 0.4 | |
2 | Rated frequency | Hz | 50 | 50 | |
3 | Rated current | A | 630 | 2000 | |
4 | Rated short circuit breaking current | KA | 25 | 50 | |
5 | Rated insulation | I min power frequency withstand voltage | kV | 65/79 | |
Lightning impulse withstand voltage | 125/145 | ||||
6 | Rated short time withstand current | kA/s | 25/4 | ||
7 | Rated peak withstand current | kA | 63 | ||
8 | Transformer rated capacity | KVA | 1000 | ||
9 | Enclosure protection degree | IP33D | |||
10 | Noise level | dB | Oil :<55 Dry : <65 |
||
11 | Transformer type | Oil or dry | |||
12 | Enclosure class | K | 20 |
standard package: wooden box
delivery time of sample: 20 days
fast shipping:
economic shipping:
Combining manufacturing experience, new technology and industrial knowledge, TENLEE aims to build advanced power distribution and protection systems.
TENLEE is specialized in manufacturing a comprehensive range of solutions from 12kv to 40.5kv for indoor/outdoor systems: gas insulated switchgears
ring main unit
sf6 free switchgears
vacuum circuit breakers
sf6 circuit breakers
reclosers
load break switches
disconnectors
distribution transformers/power transformers
substations
1. What is the standard?
IEC1330-1995 <High Voltage/Low Voltage Pre-fabricated Substation>
2.What is the delivery time:
Usually the delivery time is within 30 days.
3.Can you supply a sample?
Yes, of course.